Availability: | |
---|---|
Quantity: | |
Weiyu
Main features:
SINOTRUK HOMAN chassis with 10 CBM tank hopper
4x2 driving type with WEICHAI 160 hp diesel engine
7 CBM sewer tank capacity
3 CBM water tank capacity
Wheel base(mm):3650
Tire specification :8.25R16
Body configuration:
The volume of the pollution chain is about 7 cubic meters, and it is made of high-quality steel plate of WISCO. The wall thickness of the cylinder is 6 thick. The middle of the chain body is reasonably designed with a wave-proof reinforcement plate Degree 35 cm, wall thickness 6 thick)
The volume of the clean water tanks on both sides is 3 cubic meters, high-quality steel plates of WISCO. The wall thickness is 4 thick, the two warehouses are interconnected, the clean water tanks on both sides are installed with low-level drainage and slag discharge ports, and the top of the water tank has two 100 Ventilation port (can also be used as water filling port)
Sewage tank and clean water tank with intercommunication function (installed stainless steel filter in the middle)
The water inlet of the water tank is a ball valve type fire hydrant (easy to switch and durable), with a fire interface and a pagoda-type handwashing valve
The high pressure pump adopts Tianjin Shuangyao 215 flow high pressure pump. 22 MPa pressure, with two stainless steel large-diameter filters (to prevent impurities from entering the high-pressure pump)
The sewage suction pump adopts Shandong Zibo Wusai SK-12 water circulation vacuum pump, high precision, large suction, and oil seal design of the pump head, which does not drip water.
An anti-overflow valve is installed on the top of the sewage tank, and two stainless steel filters are installed at the air inlet of the vacuum pump (to prevent dirt from entering the vacuum pump)
The vacuum pump is equipped with a drain valve, and the pump seat is designed to be more than 26 cm above the ground, and the passing rate is high.
The rear high pressure reel is fixed by triangular double bolts, which is stable and reliable. The reel is enlarged and thickened, and it is equipped with a shower (after the high pressure pipe is operated, the high pressure pipe can be flushed when it is recovered)
The two sides are tiled with patterned plate release platform, galvanized protective net, and patterned tear-proof guardrail. Beautiful and durable
The operating systems are neatly arranged in the operation box, with operating instructions and precautions (to prevent misuse)
Both the high-pressure three-way valve and the sewage suction four-way valve are installed with shock-resistant pressure gauges with a diameter of 100, which can resist the vibration of the working environment and reduce the pulsation of the medium pressure, and accurately display the actual pressure condition
Standard with a toolbox, a 100 sewage suction port, and a 150 sewage outlet (with ball valve afterburner)
Install the air blowing water function (northern region), which can effectively blow clean the residual water in the high-pressure pipe and high-pressure pump in winter, and prevent the high-pressure pipe and high-pressure pump from freezing and cracking.
Technical Parameter | |||
Item | unit | parameter | |
Vehicle model | HOMAN Sewage Suction Truck 160hp LHD | ||
Overall dimensions | mm | 8630x2500x3290 | |
Total Mass | kg | 11200 | |
Payload | 6450 | ||
Wheel base | mm | 3650 | |
F/R suspension | 1110/2145 | ||
Exhaust | ml | 5193 | |
Max speed | km/h | 95 | |
Tire specification | 8.25R16 | Engine type | WEICHAI |
Traction system | 4*2 | Horse Power | 160HP |
Number of axles | 2 | Rear Axle Load | 8000kg |
Leaf Spring | 9/11+8 | Allowable passengers in Cab | 3 |
Upper Equipment | |||
Tank Capacity | Hoppper capacity:10 CBM Sewer tank capacity: 7 CBM Water tank capcity: 3 CBM | ||
Tank Material | Material: Q235 high tension steel, Body Thickness 6mm, End Plate thickness 8mm, With Hydraulic Controlled Rear Door and Middle lifting. | ||
Vacuum Suction Pump | Chinese Famous Brand, 4" diameter Rubber tube in 6 meters long, Vertical Suction Range 6 meters under ground level, Full Tank Suction time about 9 minutes, Vacuum Pressure -0.092Mpa. |
Main features:
SINOTRUK HOMAN chassis with 10 CBM tank hopper
4x2 driving type with WEICHAI 160 hp diesel engine
7 CBM sewer tank capacity
3 CBM water tank capacity
Wheel base(mm):3650
Tire specification :8.25R16
Body configuration:
The volume of the pollution chain is about 7 cubic meters, and it is made of high-quality steel plate of WISCO. The wall thickness of the cylinder is 6 thick. The middle of the chain body is reasonably designed with a wave-proof reinforcement plate Degree 35 cm, wall thickness 6 thick)
The volume of the clean water tanks on both sides is 3 cubic meters, high-quality steel plates of WISCO. The wall thickness is 4 thick, the two warehouses are interconnected, the clean water tanks on both sides are installed with low-level drainage and slag discharge ports, and the top of the water tank has two 100 Ventilation port (can also be used as water filling port)
Sewage tank and clean water tank with intercommunication function (installed stainless steel filter in the middle)
The water inlet of the water tank is a ball valve type fire hydrant (easy to switch and durable), with a fire interface and a pagoda-type handwashing valve
The high pressure pump adopts Tianjin Shuangyao 215 flow high pressure pump. 22 MPa pressure, with two stainless steel large-diameter filters (to prevent impurities from entering the high-pressure pump)
The sewage suction pump adopts Shandong Zibo Wusai SK-12 water circulation vacuum pump, high precision, large suction, and oil seal design of the pump head, which does not drip water.
An anti-overflow valve is installed on the top of the sewage tank, and two stainless steel filters are installed at the air inlet of the vacuum pump (to prevent dirt from entering the vacuum pump)
The vacuum pump is equipped with a drain valve, and the pump seat is designed to be more than 26 cm above the ground, and the passing rate is high.
The rear high pressure reel is fixed by triangular double bolts, which is stable and reliable. The reel is enlarged and thickened, and it is equipped with a shower (after the high pressure pipe is operated, the high pressure pipe can be flushed when it is recovered)
The two sides are tiled with patterned plate release platform, galvanized protective net, and patterned tear-proof guardrail. Beautiful and durable
The operating systems are neatly arranged in the operation box, with operating instructions and precautions (to prevent misuse)
Both the high-pressure three-way valve and the sewage suction four-way valve are installed with shock-resistant pressure gauges with a diameter of 100, which can resist the vibration of the working environment and reduce the pulsation of the medium pressure, and accurately display the actual pressure condition
Standard with a toolbox, a 100 sewage suction port, and a 150 sewage outlet (with ball valve afterburner)
Install the air blowing water function (northern region), which can effectively blow clean the residual water in the high-pressure pipe and high-pressure pump in winter, and prevent the high-pressure pipe and high-pressure pump from freezing and cracking.
Technical Parameter | |||
Item | unit | parameter | |
Vehicle model | HOMAN Sewage Suction Truck 160hp LHD | ||
Overall dimensions | mm | 8630x2500x3290 | |
Total Mass | kg | 11200 | |
Payload | 6450 | ||
Wheel base | mm | 3650 | |
F/R suspension | 1110/2145 | ||
Exhaust | ml | 5193 | |
Max speed | km/h | 95 | |
Tire specification | 8.25R16 | Engine type | WEICHAI |
Traction system | 4*2 | Horse Power | 160HP |
Number of axles | 2 | Rear Axle Load | 8000kg |
Leaf Spring | 9/11+8 | Allowable passengers in Cab | 3 |
Upper Equipment | |||
Tank Capacity | Hoppper capacity:10 CBM Sewer tank capacity: 7 CBM Water tank capcity: 3 CBM | ||
Tank Material | Material: Q235 high tension steel, Body Thickness 6mm, End Plate thickness 8mm, With Hydraulic Controlled Rear Door and Middle lifting. | ||
Vacuum Suction Pump | Chinese Famous Brand, 4" diameter Rubber tube in 6 meters long, Vertical Suction Range 6 meters under ground level, Full Tank Suction time about 9 minutes, Vacuum Pressure -0.092Mpa. |